Bid No. 23-474 & 23-475 ERHS & SMHS CTE Canopies

23-474 Santa Maria High School- The addition of a steel framed metal canopy for the existing SMHS CTE building. 23-475 Ernest Righetti High School- The addition of a steel framed metal canopy for Building I, ERHS CTE. Demolition of existing CMU exterior storage with metal roof and construction of new CMU walls/gates/covering and associated site work.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
23-474 & 23-475 Addendum 03 05.08.24 Description 245.3 KB
23-474 and 23-475 Addendum 1 04316 135.8 KB
23-474 and 23-475 Addendum 2 042324 132.7 KB
23-474 and 23-475 Addendum 4 293.0 KB
23-474 and 23-475 Addendum 5 139.6 KB
Addendum 8 (click to expand/collapse)
Name Size
23-474 & 23-475 Addendum 08 6.4 MB
Addendum No. 6 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
23-474 & 23-475 Addendum 06 07.12.24 Description 193.4 KB
23-474 & 23-475 Addendum 06 ERHS Drawings 7.4 MB
23-474 & 23-475 Addendum 06 SMHS Drawings 5.9 MB
23-474 & 23-475 Addendum 06 Specifications 1.9 MB